Risk Assessment and Risk Controls

How to assess a site manual task and apply the hierarchy of controls — from crane deliveries and lighter products down to gloves and knee pads.

Last reviewed September 2026 · Part of Manual Handling Training for Construction and Trades Workers

Key learning points

  • Work through the identify, assess, control, review cycle
  • Apply the hierarchy of controls to construction and trade manual tasks
  • Consider the task, load, environment, equipment and worker together
  • Explain why technique and PPE are not controls on their own
  • Recognise how much risk is decided before you arrive on site

The risk management cycle

  • Identify the hazards — which of the day's tasks involve manual task risk factors?
  • Assess the risk — how likely is harm, how serious could it be, and which factors drive it?
  • Control the risk — apply the most effective control that is reasonably practicable, as high in the hierarchy as you can
  • Review — check the control worked, and reassess when the task, the site or the crew changes

What to consider when assessing

The task
How is it actually done, not how the SWMS describes it? What postures, forces and repetitions are involved?
The load
Weight, size, shape, grip points, stability, how it is packaged, whether it is one or one hundred
The environment
Ground, stairs, ramps, headroom, weather, lighting, distance from the drop to the point of use
The equipment
Is a hoist, lifter, trolley or crane available, booked, working and suited to this load?
The worker
Training, licences, experience, fatigue, existing injury, whether it is an apprentice's first week
Frequency and duration
How many times today, how many days this week, and what else loads the same part of the body?
The program
Is a deadline pushing the crew to skip aids, double up loads or work through fatigue?

Hierarchy of controls

Most effective at the top

Eliminate
Remove the manual task — crane or hoist materials to the floor they are used on, order prefabricated frames, trusses and precast, order timber and pipe cut to length
Substitute
Use something less hazardous — 20 kg instead of 40 kg bags, lighter blocks or AAC, smaller sheets, pumped rather than barrowed concrete, lighter cordless tools
Isolate / engineering
Change the equipment or environment — panel lifters, brick and block carriers, vacuum lifters, material hoists, conveyors, trestles and platforms set at working height, drill stands
Administrative
Change the way work is done — delivery placement, sequencing to avoid double handling, two-person lifts, job rotation, trigger-time limits, pre-starts, SWMS, training
Personal protective equipment
Gloves and knee pads — least effective; they protect skin and joints from contact but do not reduce the force applied to the body

Technique is not a control on its own

Telling a crew to bend their knees does not change the weight of the sheet, the distance to the first floor or the number of bags. Risk should be controlled at its source so far as is reasonably practicable — by changing the load, the delivery, the equipment or the sequence. Training and technique support those controls; they do not replace them.

Practical controls on site

  • Deliveries placed as close to the point of use as possible, spread across floors by crane or hoist
  • Sequencing trades so materials are moved once, not stacked, shifted and stacked again
  • Panel lifters for ceilings, drywall carts for moving sheets, sheet handles for carrying
  • Brick and block carriers, pallets set at scaffold height, mortar boards on stands
  • Concrete pumps and motorised barrows instead of wheelbarrow runs
  • Platforms and trestles adjusted so work is between knee and shoulder height
  • Kneeling creepers, knee pads and stand-up tools for floor work
  • Sharp bits and blades, well-maintained tools, anti-vibration models and limits on trigger time
  • Two-person lifts written into the SWMS with the crew rostered to allow them
  • Shade, water and breaks in heat so fatigue does not remove control late in the day

Most of the risk is decided before you arrive

The largest manual handling gains in construction happen at design, procurement and programming: a designer who specifies lighter cladding panels, an estimator who prices crane time for deliveries, a supervisor who sequences the plasterboard to arrive after the stairs and hoist are in. By the time a sheet is on someone's shoulder, most of the options are gone. That is why the Code of Practice asks PCBUs to think about manual tasks when planning, and why it is worth raising handling problems at the tender and pre-start stage rather than at the injury stage.

Practical scenario

Scenario: a recurring back strain

Two members of a formwork crew report lower back pain in the same fortnight. They have been stripping 17 mm formply panels from a suspended slab soffit, prising each panel free overhead and lowering it by hand, then carrying panels to a stack at the far end of the deck.

What is the most effective response?

Reveal the explanation

Not 'be careful'. Assess the task and control at the source: use a stripping bar or prop release so panels drop under control rather than being prised overhead, stack at several points along the deck so the carry is short, use a trolley or the crane for the stacks, and make sure the crew is large enough to rotate. Review the SWMS for stripping, and check that pain reports stop after the change.

Practical scenario

Scenario: bags moved twice

A pallet of tile adhesive is delivered to the garage because that is where the truck could reach. The tiler moves the bags by hand to the laundry, and then moves them again room by room as the job progresses.

Which control would you choose, and where does it sit in the hierarchy?

Reveal the explanation

Ask the supplier for a split delivery, or use the site's telehandler or a hand trolley to place part-pallets in each area before tiling starts — one move, by machine or on wheels, instead of three by hand. That is elimination of the manual carry for most of the bags, supported by an engineering control for the rest. It also costs less than the injury it prevents.

Knowledge check

These questions are for your own learning. They are not part of the final assessment.

1. Which approach is most effective for reducing hazardous manual handling risk on site?

2. Having plasterboard craned onto each floor instead of carried up the stairs is an example of:

3. Why is a pair of gloves not an adequate control for carrying blocks all day?

4. When should the controls for a manual task be reviewed?